C_TS412_2021: Study Hard & Solve Questions for SAP S/4HANA Project Systems Exam

Introduction to SAP Certified Application Associate - SAP S/4HANA Project Systems Exam

S/4HANA Project Systems (C_TS412_2021) preparation guide helps you to get focused on exam. This guide also helps you to be on C_TS412_2021 exam track to get certified with good score in the final exam.

C_TS412_2021 pdf, C_TS412_2021 questions, C_TS412_2021 exam guide, C_TS412_2021 practice test, C_TS412_2021 books, C_TS412_2021 tutorial, C_TS412_2021 syllabus, SAP S/4HANA Certification, SAP S/4HANA Project Systems Online Test, SAP S/4HANA Project Systems Sample Questions, SAP S/4HANA Project Systems Exam Questions, SAP S/4HANA Project Systems Simulator, SAP S/4HANA Project Systems Mock Test, SAP S/4HANA Project Systems Quiz, SAP S/4HANA Project Systems Certification Question Bank, SAP S/4HANA Project Systems Certification Questions and Answers, SAP S/4HANA Project Systems, C_TS412_2021, C_TS412_2021 Exam Questions, C_TS412_2021 Questions and Answers, C_TS412_2021 Sample Questions, C_TS412_2021 Test

C_TS412_2021 S/4HANA Project Systems Exam Summary

Exam Syllabus: C_TS412_2021 SAP Certified Application Associate - SAP S/4HANA Project Systems

1. Project Structures

Name the components of Work Breakdown Structure, Network and activities, Milestones

Books:

      S4121 (SAP S/4HANA 2021)

      S4122 (SAP S/4HANA 2021)

2. Material

Explain Work breakdown structure BOM, BOM PS Interface, component assignment in the network, material procurement

Books:

      S4122 (SAP S/4HANA 2021)

3. Cost & Budgets

Describe procedures for establishing budgets and reporting costs

Books:

      S4123 (SAP S/4HANA 2021)

4. Dates

Describe the importance of various dates which can be tracked for projects

Books:

      S4122 (SAP S/4HANA 2021)

5. Revenues and Payments

Describe the characteristics of Revenues & Payments.

Books:

      S4123 (SAP S/4HANA 2021)

6. Resources

Describe how the Capacity Planning process is carried out.

Books:

      S4122 (SAP S/4HANA 2021)

7. Reporting

Determine general reporting requirements and report types for SAP S/4HANA Project System.

Books:

      S4120 (SAP S/4HANA 2021)

SAP C_TS412_2021 Certification Sample Questions and Answers

To make you familiar with S/4HANA Project Systems (C_TS412_2021) certification exam structure, we have prepared this sample question set. We suggest you to try our Sample Questions for PS C_TS412_2021 Certification to test your understanding of SAP C_TS412_2021process with real SAP certification exam environment.

C_TS412_2021S/4HANA Project Systems Sample Questions:-

01. You have implemented automatic requirements grouping for projects. Once you check the materials cabin and fork you realize that the requirements are grouped for cabin but not for fork.

What might be the reason?

Please choose the correct answer.

a) The grouping indicator of the top WBS element is set to a single MRP Group.

b) The network is set to no grouping for specific MRP Groups.

c) The MRP Group for fork is deactivated for grouping.

d) The project definition is set to no project stock.

 Answer: c

02. You want to maintain basic data and dates of a WBS element on the same tab. Also, basic start and basic finish should be mandatory fields. What do you need to configure?

There are 2 correct answers to this question.

a) Define Layout Detail Screen for the WBS element to specify customer-specific tabs.

b) Define Create User-Defined Fields for the WBS element to specify the mandatory fields.

c) Define Field Selection for the WBS element to specify the mandatory fields.

d) Define Table Settings for the WBS element to specify customer-specific tabs.

 Answer: a, c

03. Most of the reports in SAP Project System can be refreshed without exiting or closing the report. Which report must be restarted to update the displayed data?

Please choose the correct answer.

a) Hierarchical Reports

b) Individual Overviews

c) Reports by Cost Element

d) Structure Overview

Answer: a

04. You have created a network with planned work for internal activities. In a capacity planning report, you discover that no capacity requirements were determined.

What are the possible reasons for this?

There are 3 correct answers to this question.

a) A work center has not been assigned to the activity.

b) The work center does not contain any available capacity data.

c) The wrong activity type category is entered in the activity.

d) The indicator that calculates capacity requirements is deactivated in the header of the network.

e) The capacity distribution key field is empty.

 Answer: a, b, d

05. You want to confirm working hours to a WBS element using SAP Cross Application Time Sheet (SAP CATS). However, once you enter the WBS element and the working hours in SAP CATS you receive an error message. What could be the reason?

Please choose the correct answer.

a) The system status "created" is active.

b) The system status "master data locked" is active.

c) You are not the responsible person for that WBS element.

d) The confirmation exceeds the budget assigned to the WBS element.

 Answer: a

06. What is copied when transferring a simulation version back to an operative project?

There are 3 correct answers to this question.

a) Plan costs

b) WBS elements

c) Actual work

d) Maintenance orders assigned to the project

e) Network activities

 Answer: a, b, e

07. When using budgeting and active availability control, which business transactions affect the current budget?

There are 3 correct answers to this question.

a) Cost element planning

b) Original budget

c) Revenues

d) Transfers

e) Supplements

 Answer: b, d, e

08. You have created a network with successive activities. After scheduling the network, the Gantt chart shows that every activity has the same earliest start and earliest finish date as the network header. What could be the reason?

Please choose the correct answer.

a) The control key is set to no scheduling.

b) The scheduling type is set to capacity requirements only.

c) The normal duration of each activity is missing.

d) There is a loop in the network.

 Answer: b

09. How can material components be assigned to network activities?

There are 3 correct answers to this question.

a) Using manual assignment.

b) Using the bill of materials transfer.

c) Using assigned sales orders.

d) Using Project-Oriented Procurement (ProMan).

e) Using the Internet-based catalog.

 Answer: a, b, e

10. You want to extrapolate basic dates from lower to higher-level WBS elements. The duration of higher-level elements should NOT be reduced. Which planning method do you choose?

Please choose the correct answer.

a) Bottom-up

b) Strict bottom-up

c) Free planning

d) Top-down

 Answer: a

Comments

Popular posts from this blog

How I scored 87% in C_ARP2P_2208 exam for SAP Ariba Procurement Certification

How I scored 83% in C_TS4CO_2020 exam for SAP S/4HANA Management Accounting Certification

SAP C_THR95_2305 Certification: Everything You Should Know